# Master Shower Refresh

**URL:** https://makermattdesign.com/t/master-shower-refresh/434
**Category:** General
**Tags:** home-upgrade
**Created:** [January 8, 2026, 11:45pm UTC](https://makermattdesign.com/t/master-shower-refresh/434 "2026-01-08T23:45:40Z")
**Posts on this page:** 1
**Page:** 1

<div class="post-metadata">

### Author: ![Matt](https://makermattdesign.com/letter_avatar_proxy/v4/letter/m/a6a055/32.png) [@Matt](https://makermattdesign.com/u/Matt)
#### Post date: [January 8, 2026, 11:45pm UTC](https://makermattdesign.com/t/master-shower-refresh/434/1 "2026-01-08T23:45:40Z")

</div>

Built it 1970, it is time to upgrade the Master Shower. It is a small room, only 6’ x 5’, currently occupied by a toilet and a tub/shower.

 ![image](https://makermattdesign.com/uploads/default/original/1X/e2f66a966c5bb2deb94fbf3ab606d0134e439a8d.jpeg)

# Master Bath Upgrade

Big picture: Replace the tub with a walk in shower. Remove the false ceiling. Tile the entire room making it a wet room.

Wall tile: Alessia Bianca, 12"x24" porcelain tile.

 ![image](https://makermattdesign.com/uploads/default/original/1X/42f38749f5eaacc3470a5dc9a5b0bf8ab10dddfa.jpeg)

Floor tile: Tarsus Almond, hexagon

 ![image](https://makermattdesign.com/uploads/default/original/1X/f15212bbacbf50cc38be3518bcc218481b66fdc1.jpeg)

LED lighting to use existing fixture, type TBD.

Grab bar/towel bar: Replace the existing bars with structurally sound

 ![image](https://makermattdesign.com/uploads/default/original/1X/395ecd3ccc613d5885387117b82efe1268fe4013.jpeg)

Triangular corner seat

 ![image](https://makermattdesign.com/uploads/default/original/1X/9333ea159805d88b782ac4bbec0a08f47f59a372.jpeg)

Corner shelf, 2 ea,

 ![image](https://makermattdesign.com/uploads/default/original/1X/636c8bb95a1c2955b36e7a344f24e9037369fd5b.jpeg)

Supplies required:

- Thinset
- Grout
- Shower head, rainfall + wand
- Drain
